Skip to main content

Managing a high pressure 24 hour reconstruction for leading national news broadcasters

ITN Studio, London

/

£1.2m Budget

Live Broadcast Basement Post-Production Delivered Under Budget.

The dismantling and reconstruction of a basement complex against a background of ongoing live broadcasting for ITV, Channel 4 and Channel 5.

East On Media Solutions worked a 24 hour schedule. When ITN was broadcasting live news, we were silent and invisible. When they drew breath we worked. In six months we delivered high specification edit suites whilst overseeing technical installation plus testing and commissioning. All with zero disruption.

Eight state-of-the art post-production suites, and a Dolby and Netflix-Accredited Atmos suite. East On then managed the upgrade of the audio desks from S4 to S6 and built a dedicated local comms room with a farm for remote working as the Pandemic took hold.

The overall project was delivered under budget through savings made by design enhancements and innovative build techniques. That’s called Value Engineering, and it’s something we have taken to the very core of our business ethos.

Read more related projects

From functional to flexible: Revitalising a lower ground floor workspace

Read More
Channel 4 Logo White

Future-Proofing the 21st Century Newsroom offices at Channel 4

Read More
DPD Logo White

Crafting a stunning wellness suite for one of Europe’s largest parcel delivery businesses

Read More